One Coat* Products

One Coat* Paint Means Time Better Spent

One Coat* Products

Make Painting Easier by using a one coat* product

Rely on one coat* colors and products to deliver great results in fewer coats. Choose from over 1,000 colors with one coat* coverage.

Let Us Help Simplify Your Color Selection
Look for this icon to quickly and easily identify one coat* colors offered across our most popular products.



*One coat hide & coverage only when tinted to select Pittsburgh Paints & Stains color palettes. Click here for all colors and products
 

One Coat* Products


 


Feeling overwhelmed when choosing a paint color? Take inspiration from our most popular one-coat* colors.

LET'S SIMPLIFY FOR YOU

Our Top One Coat* Colors

Feeling overwhelmed when choosing a paint color? Take inspiration from our most popular one-coat* colors.

These tools make application a breeze!

  • 9” Roller cover, 3/8” Nap High Quality Woven

  • 9” Roller Frame

  • 2” Angled brush for cut in

  • Painting trays

  • Tarps & plastic

  • Painter’s tape

  • Ladder & step stool

  • Rags

What Materials Will I Need?

What Materials Will I Need?

These tools make application a breeze!

  • 9” Roller cover, 3/8” Nap High Quality Woven

  • 9” Roller Frame

  • 2” Angled brush for cut in

  • Painting trays

  • Tarps & plastic

  • Painter’s tape

  • Ladder & step stool

  • Rags

Wash walls before painting and rinse well. Fill in all cracks and nail holes with crack filler and spot prime as needed. Tape off all areas to be painted and stir paint thoroughly before use.

Prep Your Walls

Application Steps - Step 1

Prep Your Walls

Wash walls before painting and rinse well. Fill in all cracks and nail holes with crack filler and spot prime as needed. Tape off all areas to be painted and stir paint thoroughly before use.

Apply one coat* using a premium-quality 3/8” nap roller. Use a 2” angled brush for any areas around the edges or cut in. Allow area to dry for at least 2-4 hours.

Apply the First and Only Coat

Application Steps - Step 2

Apply the First and Only Coat

Apply one coat* using a premium-quality 3/8” nap roller. Use a 2” angled brush for any areas around the edges or cut in. Allow area to dry for at least 2-4 hours.